Microsoft Exchange 2013 Public Folders Migration and Directory Sync Support Scripts

by Arman Obosyan 11. April 2013 09:14

Use these scripts to migrate public folders from Exchange 2010 or 2007 to Exchange 2013. In order to migrate Exchange 2010 or 2007 Public Folders to Exchange 2013 on O365, we need to analyze the existing Public Folder hierarchy for size to figure out the number of Public Folder mailboxes that are required on O365 and the distribution of folders across mailboxes.

Migration\Export-PublicFolderStatistics.ps1
Migration\Export-PublicFolderStatistics.strings.psd1
Migration\PublicFolderToMailboxMapGenerator.ps1
Migration\PublicFolderToMailboxMapGenerator.strings.psd1

Download Public Folders Migration Scripts

---

Use this scripts if you need to do one of the following - Initial creation of mail enabled public folder objects in the destination Active Directory for public folder migration from Exchange 2007 or 2010 to Exchange 2013

  • Synchronization of mail enabled public folder objects from cloud to on-premise Active Directory
  • Synchronization of mail enabled public folder objects from on-premise to cloud Active Directory
  • Synchronization of public folder mailbox objects from cloud to on-premise Active Directory

DirSync\Export-MailPublicFoldersForMigration.ps1
DirSync\Import-MailPublicFolders.ps1
DirSync\Import-MailPublicFoldersForMigration.ps1
DirSync\Import-PublicFolderMailboxes.ps1
DirSync\MailPublicFolders.strings.psd1

Download Public Folders Directory Sync Support Scripts

Lync 2010 Client and Attendee April Updates

by Arman Obosyan 10. April 2013 13:29

Обновления для Lync 2010 (клиент)

Lync 2010 Hotfix KB 2815347 (64 bit)

Version: 7577.4384
Date published: 4/9/2013
Language: English
KB articles: KB2815347
File name: 18.7 MB
Size: Lync.msp 

Lync 2010 Hotfix KB 2815347 (32 bit)

Version: 7577.4384
Date published: 4/9/2013
Language: English 
KB articles: KB2815347
File name: Lync.msp
Size: 17.6 MB

---


Обновления для Lync 2010 Attendee

Lync 2010 Attendee Hotfix KB 2815352 (User level install)

Version: 7577.4382
Date published: 4/9/2013
Language: English
KB articles: KB2815352
File name: AttendeeUser.msp
Size: 22.6 MB

Lync 2010 Attendee Hotfix KB 2815354 (Admin level install)

Version: 7577.4382
Date published: 4/9/2013
Language: English 
KB articles: KB2815354
File name: AttendeeAdmin.msp
Size: 16.2 MB

---

Обновленная версия Lync 2010 Attendee, номер сборки 7577.4382

Microsoft Lync 2010 Attendee - User Level Install

Version: 7577.4382
Date published: 4/9/2013
KB articles: KB2500440
File name: AttendeeSetupUser.exe
Size: 57.9 MB

Microsoft Lync 2010 Attendee - Admin Level Install

Version: 7577.4382
Date published: 4/9/2013
KB articles: KB2500438
File name: AttendeeSetupAdmin.exe
Size: 61.1 MB

Microsoft Exchange Server 2013 CU1 Help File

by Arman Obosyan 5. April 2013 10:25

Help content for Microsoft Exchange Server 2013 Hybrid Deployments and Cumulative Update 1 of Microsoft Exchange Server 2013.

Version: April2013    
Date published: 4/4/2013
Language: English

File name: Exch2013HybridHelp.exe   
Size: 501 KB
File name: Exch2013OnPremHelp.exe    
Size: 10.3 MB

Download Microsoft Exchange Server 2013 CU1 April 2013 Help

Cumulative update 1 for Exchange Server 2013 (KB2816900)

by Arman Obosyan 2. April 2013 23:47

Cumulative Update 1 (CU1) for Exchange Server 2013 resolves issues that were found in Exchange Server 2013 since the software was released. This update rollup is highly recommended for all Exchange Server 2013 customers.

CU1 for Microsoft Exchange Server 2013 provides the latest fixes for Exchange Server 2013 and contains stability and performance improvements. This update enables you to install Exchange Server 2013 in your existing Exchange Server 2010 or 2007 organization.

Note: The CU1 package can be used to perform a new installation, or to update an existing Exchange Server 2013 installation to CU1.

Version: 15.00.0620.029
Date published: 4/2/2013
KB articles: KB2816900
File name: Exchange-x64.exe
Size: 1.3 GB
Release Notes for Exchange 2013

Download Cumulative Update 1 (CU1) for Exchange Server 2013

For more information visit The Exchange Team Blog
Released: Exchange Server 2013 RTM Cumulative Update 1

High Availability Changes in Exchange Server 2013 Cumulative Update 1

Microsoft Lync 2013 for Mobile Devices

by Arman Obosyan 12. March 2013 08:01

Lync 2013 extends the power of Lync to your mobile device – including voice & video over wireless, rich presence, instant messaging, conferencing, and calling features from a single, easy-to-use interface.

Key Features:

  • View colleagues’ availability in real time and select the best way to communicate
  • initiating an instant message (IM), email, voice or video call.
  • Connect to Lync Meetings with a single touch, without requiring long numeric passcodes or conference numbers.
  • Forward or simultaneously ring calls to your Enterprise Voice (Lync ID) number so you’ll never miss a call.

Lync 2013 provides transport layer security (TLS) and perimeter/internal network protection without requiring a VPN, so your communications experience is safer no matter where you are or what network you use.

Microsoft Lync 2013 is available for Windows Phone, iPhone, iPAD, Android Lync 2013 is coming soon

Microsoft Lync 2013 for Windows Phone  Microsoft Lync 2013 for iPhone  Microsoft Lync 2013 for iPad

 

Download Microsoft Lync 2013

Lync Server 2013 Capacity Calculator

by Arman Obosyan 28. February 2013 08:53

The Microsoft Lync Server 2013 capacity planning calculator is designed to assist you in determining server requirements based on numbers of users and communication modalities that are enabled at your organization. You enter your organization’s profile, and the calculator provides recommendations that help you plan your topology.

The recommendations created by the calculator are for planning purposes only. Actual load simulation is required to ensure that Lync Server 2013 is adequately provisioned. To perform stress testing under a simulated load, use the Lync Server 2013 Stress and Performance Tool.

After you have determined your user profile and the modalities that you want to enable for your users, it is time to use the calculator to plan the number of servers, memory, and bandwidth that you need. This version of the calculator does not provide guidance for disk I/O requirements.

This calculator complements the Microsoft Lync Server 2013 Planning Tool and Microsoft Lync Server 2013 Planning documentation. Use the calculator after you have reviewed the guide and created a recommended topology by using the Planning Tool.

You can benefit most from the calculator if you have accurate, detailed information about your specific user profile. For example, the percentage of voice-enabled users, average calls per user per hour, call duration, and the percentage of concurrent users in conferences can make a huge difference in server requirements. The accuracy of the recommendations created by the calculator depends on the accuracy of the information that you provide.

Download Lync Server 2013 Capacity Calculator

Version: 1
Date published: 2/27/2013
Language: English
Files in this download
Lync Server 2013 Capacity Planning Calculator Guide.docx 26 KB
Lync_Server _2013 _Scenario _Based _Capacity _Calculator.xlsx 36 KB

Lync Server 2013 Capacity Calculator

Microsoft Lync Server 2013 Planning Tool

by Arman Obosyan 28. February 2013 01:13

The Microsoft Lync Server 2013, Planning Tool asks you a series of questions about your organization and the features that you are interested in. The planning tool will then use your answers to recommend a topology based on the tested Microsoft Lync Server 2013 user model.

Your organization may have a different user model. If so, you should adjust the recommended topology as necessary to fit your organization’s needs.

What’s New in the Planning Tool for Lync Server 2013?

  • The Planning Tool now allow user to have up to 10 sites, including central site and disaster recovery site
  • Lync Server Planning Tool 2013 offers the capacity guidance for Lync Server 2013 new and updated features, including below areas. User can answer the question regarding these features through Planning Tool, and then the suggested topology will contain the information, e.g hardware, network, DNS, certificate, IP, etc, according to the Lync Server 2013 user model.
    • Persistent Chat
    • Archiving with Exchange integration
    • Mobility
    • Multi-view Video
    • High Availability and Disaster Recovery
    • Office Web Apps
    • Exchange Mailbox
  • Lync Server Planning Tool 2013 allow user to have IPv6 IP address
  • Planning Tool identifies the IP conflicts across sites in the suggest topology. User can choose to show or hide IP conflict in the topology.
  • Planning Tool offers a more user friend FQDN/IP/Port editing dialog
  • Planning Tool updates the suggested hardware requirement, DNS and certificates with Lync Server 2013 changes
  • Planning Tool updates the planning steps and deployment steps with Lync Server 2013 changes
  • Lync Server Planning Tool 2013 support the better accessibility requirement
  • Lync Server Planning Tool 2013 offers the better exported Visio and Excel files. Visio file matches the suggested topology diagram in Planning Tool well.
  • Lync Server Planning Tool 2013 does not support the below features any more
    • Virtualized server design
    • Export the Planning Tool file to Topology Builder

----

Download Microsoft Lync Server 2013, Planning Tool

Version: 8308.279
Date published: 2/26/2013
File name: LyncPlanningTool.msi
Size: 1.6 MB

Microsoft Lync Server 2013 Planning Tool

© 2008-2012, Arman Obosyan, Postmaster.GE
Powered by BlogEngine.NET 2.6.0.18
Hosted on Windows Azure and IIS8

About the author

Arman Obosyan is an experienced IT Pro. with over 12 years work experience in Information Technologies sector.

Now is working on a position Technology Strategist at Microsoft Corporation.

Last 2 years working in National Bank of Georgia on a position Head of IT Infrastructure. His specialization is Messaging, Directory Services and other Microsoft server software solutions; also has good experience in maintenance and configuring Enterprise class storages and Enterprise class hardware/software solutions from various vendors,....

His hobby is Computers and despite very loaded and heavy working schedule he always finds time to participate in testing of Microsoft’s new Beta products.

Certified since 2003 year, passed following certifications MCP, MCSA, MCSE, MCTS, MCITP, Exin ITIL and
VMware Certified Professional (VCP)

In 2010 Was awarded a Microsoft Most Valuable Professional (MVP)

--------

Disclaimer
The opinions expressed herein are my own personal opinions and do not represent anyone else's view in any way, including those of my employer.


Calendar

<<  May 2013  >>
MoTuWeThFrSaSu
293012345
6789101112
13141516171819
20212223242526
272829303112
3456789

View posts in large calendar

Twitter

 

Live Trafic

 


Veeam Backup & Replication Cloud Edition